Yesterday was set up for the 2015 NRA Annual Meeting. These photos give you a feeling for the chaos that ensues the day before a show but I can assure, tear down goes much faster.
This entry was posted
on Friday, April 10th, 2015 at 13:30 and is filed under Admin.
You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.
I did some work with a production company for a few months where we set up for large shows and parties. I remember dreading the setup sometimes. The time constraints that were placed on us were pretty tight at times. Tear down was usually about a quarter to a third of the time.
I did some work with a production company for a few months where we set up for large shows and parties. I remember dreading the setup sometimes. The time constraints that were placed on us were pretty tight at times. Tear down was usually about a quarter to a third of the time.
the urinal sign is great.
Yeah, I need someone at the show to bring that back for me. Classic!