TYR Tactical

Mobile Power Solutions Announces AS9100D & ISO 9001:2015 Certification

Battery technology center is further certified to manufacture and test batteries for complex aviation, space and defense projects
BEAVERTON, Ore., June 25, 2020 – Mobile Power Solutions, a leading battery testing/certification lab and battery pack assembler, today announced it earned AS9100D/ISO 9001:2015 certification. ISO 9001:2015 is the international standard that specifies requirements for a quality management system. Organizations use the standard to demonstrate the ability to consistently provide products and services that meet customer and regulatory requirements. AS9100D is an extension of ISO 9001:2015 processes to satisfy the more challenging requirements for the design, development and manufacturing of aviation, space and defense products. Mobile Power Solutions is certified to manufacture and test batteries for the commercial and aerospace industry with this certification.

“We are pleased to have earned AS9100D /ISO 9001:2015 certification for our battery technology center,” said Chuck Weitzel, owner of Mobile Power Solutions. “This certification supports our commitment to help our customers identify and avoid the pitfalls and problems inherent in complex mission-critical battery design and assembly projects within the commercial and aerospace industry,” he continued.

Mobile Power Solutions is trusted by major aerospace OEMs for a broad range of battery design, assembly, testing and analysis services that meet exacting specifications. Working with tier-one cell manufacturers, it concentrates on important battery pack design considerations like safety, system integration, reliability, power and the ability to meet requirements across a wide range of harsh environmental conditions.

Mobile Power Solutions offers the following services, all available under one roof with one point of contact:
• Cell selection and cell vendor qualification
• Cell and battery pack design
• Design review for manufacturability
• BMU selection and design
• Detailed assembly procedures and QC documentation
• Customer-supplied BOM or our own sourced and purchased BOM
• Cell vendor qualification – initial and/or ongoing
• Risk mitigation and DFMEA
• Regulatory requirements and certifications

www.mobilepowersolutions.com

Comments are closed.