XC3 Weaponlight

Archive for the ‘Contracts’ Category

Wanted – Native American Medicine Man

Thursday, August 19th, 2010

We spend more time than we would probably like on FedBizOpps, but we didn’t catch this one ourselves. One of our readers with lots of time on his hands sent us this one. While to many, it will be a simple curiosity, ultimately, it goes to show the lengths that the US Government will go to to do the right thing and provide religious accommodation.

Federal Bureau of Prisons, FPC Duluth, Duluth, MN, is seeking a Native American Medicine Man to visit the facility four times a year and “conduct Native American ceremonies and provide instruction to inmates in the Native American Faith.

General Topics for Contractors – Native American
1. Red Road
2. All My Relation
3. Medicine Wheel
4. The Sacred Pipe
5. Sweat Lodge
6. Elders
7. Circle of Life
8. Traditions/Rituals
9. Prayers
10. Ceremonies
11. Fasting
12. Smudging
13. The Drum
14. Grandfather/Grandmother
15. Dances
16. The Medicine Pouch
17. Offerings
18. Decision-making
19. Ritual Objects
20. Eagle
21. Eagle Feathers
22. Nature Lessons
23. Family Relations
24. Parenting
25. Learning
26. Healthy Relationships
27. Culture
28. Healing Traditions
29. Herbal Medicines
30. Understanding Self
31. Respect
32. Traditional Games
33. Traditional Foods
34. Seasons
35. Healing Self
36. A Grateful Heart
37. Cleansing Ceremonies
38. What is the role of faith and Community Re-entry?

The contractor will provide 4 sessions per year. The sessions will either be on Thursdays from 11:30 a.m. to 3:30 p.m. (Pipe ceremony) or on Sundays from 11:30 a.m. to 3:30 p.m. (sweat ceremony).”

Camouflage Patterns, Concepts and Design/Analysis Tools

Thursday, June 3rd, 2010

Could the recent Sources Sought Notice from Natick for Camouflage Patterns, Concepts and Design/Analysis Tools be in support of the Army’s fabled Phase IV of their camouflage plan? We hear that so far only a few companies have ponied up and this has prompted Natick’s Multifunctional Materials Team, Warfighter Science, Technology and Research Directorate to extend the deadline from May 28th until June 18th. Interested parties should check out the Sources Sought Notice and respond if you have something of interest. Now is the time to stand up and be counted.

Apparently, whatever the final plan is for Phase IV it is supposed to be on the Chief of Staff of the Army’s desk by 14 November and word has it that the Army-wide adoption of MultiCam will be one of the courses of action. At this point, it is the path of least resistance since to do nothing and retain UCP would meet a great deal of operational resistance based on several rounds of testing. Additionally, industry is beginning to energize a supply chain for MultiCam that can be further ramped up to meet increased demand. We fully support the continued development of more advanced patterns but MultiCam increases capability immediately. What’s more we would like to see the Air Force adopt MultiCam at least for deployed forces.

Navy Seeks Survival Gear and FR Clothing

Tuesday, May 25th, 2010

NAVAIR has issued a Sources Sought Notice for Survival Items and Clothing for use by both Navy and marine Corps personnel. Survival items include equipment to assist isolated personnel in their recovery such as NVD compatible lights, signaling devices, hand held global positioning systems, knives, fire starters, multi purpose tools, water purification devices, hydration carriers and concentrated nutrition. All items should be efficient, compact, lightweight, water resistant, affordable and use common, commercially available batteries as a power source if needed.

The FR clothing side of the house includes items for both air and ground crews like flight suits and gloves, deck jerseys, and anti-exposure suits. They are seeking performance products whether fire resistance, environmental protection, or moisture management. This is an open ended RFI so as vendors come up with applicable items they can submit them.

Visit www.fbo.gov for the full details.

Army Seeks Small Business MOLLE Manufacturers

Thursday, April 1st, 2010

While the Sources Sought Notice came and went, the fact remains that the Army is considering seeking small businesses to manufacture MOLLE. Yes, businesses as they anticipate multiple awards. They are looking at a three year Indefinite Delivery Indefinite Quantity (IDIQ) contract with one base year plus two option years. This means that the government will set minimums and maximums for a contract year and will place orders as they are needed and within those limits. Option years are awarded at the discretion of the government based upon need and performance.

For example, the government proposes a maximum base year consisting of production of 50,000 MOLLE Rifleman sets, 50,000 Tactical Assault Panels, 50,000 Medium Rucksacks, 50,000 Hydration Systems, 5000 Grenadier and SAW sets, 10,000 Pistol sets, and 2000 Medic Sets.

One issue that the Sources Sought puts to rest is whether we would see a new solicitation for the still under development Medium Rucksack which just recently finished phase I testing at Fort Knox. Medium Rucksack will become a component of MOLLE and produced under that contract. The Army hopes to begin fielding as early as July for use in Afghanistan.

The sources sought notice contains a great deal of info for those interested in MOLLE and is worth the read.

MultiCam – Who Pays?

Monday, March 15th, 2010

The easy part is done. A camouflage pattern has been selected for use in Afghanistan in accordance with the wishes of Congress. The hard part has now begun. Specifications have to be prepared, contracts let, and new equipment fielded. All in rapid fashion if the Army is going to meet its own deadline this summer. Fielding of a new pattern won’t come cheap. According to COL William Cole, the Program Manager for Soldier Clothing and Individual Equipment at PEO-Soldier, thus far everything has been paid for with offsets meaning the money used to purchase FR ACUs in UCP will be used instead to procure MultiCam FR ACUs. Unfortunately, this won’t make up for everything. TA-50 such as MOLLE lasts a lot longer than uniform items. With over one million sets of MOLLE already fielded, equipment in MultiCam will have to be purchased.

Soldier Patrols Wearing MultiCam
U.S. Army photo by Spc. Albert L. Kelley, 300th Mobile Public Affairs Detachment

An additional issue, particularly for industry are ancillary items such as gloves, hats, and even the webbing tape on load bearing and armor systems. What color will it be? With the switch to UCP came Foliage Green. What color will the Army specify for use with MultiCam? PEO-Soldier officials have stated that they are still considering the issue but with the new Army Combat Shirt in MultiCam sporting a Coyote Brown torso, chances are good that will be the accessory color (UPDATE: It’s sounding like Tan 499 will make the cut). Additionally, industry is already producing a wide variety of raw materials and finished goods in Coyote for the Marine Corps, SOCOM, as well as the secondary market.

So where will the money to pay for all of this come from? The Army hasn’t prepared any reprogramming actions moving funds from one account to another to pay for this. And if it is forced to, where will those funds come from? PEO-Soldier’s portfolio? Will the Army be forced to rob Peter to pay Paul? If this ends up being the case, the Soldier loses either way. As I see it, it is Congress’s bill to pay. Congress asked for it, the Army complied, and they have the facts to back up their decision. The Army’s leadership should approach Congress with a funding request to field adequate amounts of clothing and individual equipment in MultiCam. Congress should happily appropriate these monies. In fact, if anything, it will leave a lasting legacy in honor of the man who got this ball rolling in the first place, the late John Murtha.

BAA for Warfighter Developmental Protective Clothing and Devices

Monday, March 1st, 2010

If you’ve got a great new widget that fits any one of the categories below then Naval Air Systems Command at Pax River wants to hear about it. What’s great about a Broad Agency Announcement is that they last all year so it’s easy to make the deadline and are intended to cast a wide net in search of solutions for issues facing a command. There aren’t any pesky requirements that you have to meet. They want to hear about your good ideas and see if they fill any of their capability gaps.

(1) protection against G-induced loss of consciousness, loss of situational awareness, spatial disorientation, and high altitude hypoxia; (2) micro / nanotechnology applicable to life support and protective devices; (3) protection against hypothermia / hyperthermia; (4) auxiliary or integrated human cooling and heating systems; (5) integrated helmet mounted displays, multi-mode helmet vision system technology; (6) advanced filter / device development for eye and / or sensor protection; (7) warfighter / equipment compatibility; (8) breathing systems and advanced concept approaches for current and future applications; (9) crash protection, advanced restraint systems (all axes of restraint), accelerative loads reduction and seating concepts; (10) emergency egress / escape concepts such as but not limited to improved signaling / locating, thermal signature reduction, and day / night cloaking technologies (11) integrated communications systems; (12) hearing protection and communication capabilities in high noise environments (13) integrated floatation systems; (14) human strength enhancement technologies; (15) garment textiles / materials, flame resistant / melt-proof fibers, webbings, water-proof, high-stretch, breathable fabrics, durable, malleable, lightweight conductive-network fabrics, low-bulk / high flexibility vascular compression mechanisms for acceleration protection, fast-response cooling / heating textiles; (16) crew / workstation design; (17) lightweight, portable power sources, recharging and scavenging technologies, and (18) other personal protective technologies.

As you can see this pretty much runs the gamut of Soldier Systems as well as some aviation technologies. If you think you’ve got what they need you will need to submit a white paper. Check out the entire solicitation at www.fbo.gov for further guidance.

SPEAR BALCS Low Visibility Body Armor Vest (LBAV) Pre-solicitation

Thursday, January 28th, 2010

Natick dropped a pre-solicitation for a new Low Viz Body Armor carrier on the street on the 15th of January while all of us were concentrating on SHOT Show. The actual solicitation which is supposed to hit the street by the end of the month is worth, “The minimum contract value will be $57,000 with a maximum value of $22,800,000.00.” SOCOM is seeking a Commercial Off The Shelf carrier and vendors will have 30 days to submit to include, “Complete proposals shall contain offerors technical, manufacturability, past performance, price and warranties to include Production Demonstration Systems (PDSs) packages. Initial Submissions will require 3 complete PDSs for each size and version of the SPEAR BALCS LVBAV.” This is for carriers only and not armor.

PACA Low Viz Carrier

This requirement has been fulfilled for many years by the PACA carrier. However, it was only compatible with BALCS cut armor and plates used in the CIRAS and RBAV. This procurement demands a carrier that is compatible with both the RBAV and MBAV armor.

Finally, this is a set aside for small business. With so many companies being gobbled up by big business I wonder who is left to support this solicitation. Read about it here.

German Military Awards Pre-Production Contract for Future Soldier System

Monday, December 21st, 2009

The German Bundesamt für Wehrtechnik und Beschaffung (Federal Agency for Defense Technology and Procurement) in Koblenz, awarded Rheinmetall Defence a contract for pre-production examples of the IdZ-ES (Infanterist der Zukunft – Erweitertes System or Future Soldier – Expanded System) last Thursday, 17 December.

IdZ system from Rheinmetall

The program began in 2004 but in 2006 Rheinmetall Defence assumed lead for development of the system after an EADS led “Projekthaus System Soldat” version proved to have deficiencies. Rheinmetall claims this is an entirely new system. Full-scale procurement is to begin in 2012. Ultimately, they plan to purchase 1000 kits for all three armed services with each kit equipping 10 men.